Best News Network

Intel Meteor Lake chip delayed to 2024, TSMC slows 3nm expansion | Digit

New Delhi, Aug 6 (IANS) The mass production of chip-maker Intels next big flagship processor Meteor Lake is expected to be delayed until 2024, a report has said.

According to TrendForce research, Intel plans to outsource the tGPU chipset in Meteor Lake to Taiwan Semiconductor Manufacturing Company (TSMC) for manufacture.

“Mass production of this product was initially planned for 2H22 but was later postponed to 1H23 due to product design and process verification issues,” the report mentioned.

Recently, the product’s mass production schedule has been postponed again to the end of 2023 for some reason, “completely cancelling 3nm production capacity originally booked in 2023 with only a marginal amount of wafer input remaining for engineering verification”.

Intel said earlier this year that Meteor Lake would be “powering on” this summer before shipping in 2023.

This incident has “greatly affected TSMC’s production expansion plan, resulting in Apple being the one company among the first wave of 3nm process clients from 2H22 to the start 2023 with products including M series chips and A17 Bionic”, the report mentioned.

In view of this, TSMC has decided to slow the progress of its production expansion.

In addition to formally notifying equipment suppliers of the company’s intention to adjust 2023 equipment orders, due to the high cost of 3nm expansion, TrendForce expects that this move will also affect some parts of TSMC’s 2023 CapEx planning.

Apple’s new 2024 iPhone is expected to fully adopt 3nm processors.

“If Intel 4 fails to mass-produce as scheduled, Intel may outsource its computing tiles to TSMC, strongly driving growth in 2024,” it added.

Intel suffered a 25 per cent decline in consumer chip sales in the second quarter, along with revenue of $15.3 billion, down 22 per cent year over year (YoY).

Its profits nosedived as it lost half a billion dollars in the April-June period — a 109 per cent decline in profit from $5.1 billion it saw in Q2 last year.

(Except for the headline, the rest of this IANS article is un-edited)

For more technology news, product reviews, sci-tech features and updates, keep reading Digit.in

Stay connected with us on social media platform for instant update click here to join our  Twitter, & Facebook

We are now on Telegram. Click here to join our channel (@TechiUpdate) and stay updated with the latest Technology headlines.

For all the latest Technology News Click Here 

 For the latest news and updates, follow us on Google News

Read original article here

Denial of responsibility! NewsAzi is an automatic aggregator around the global media. All the content are available free on Internet. We have just arranged it in one platform for educational purpose only. In each content, the hyperlink to the primary source is specified. All trademarks belong to their rightful owners, all materials to their authors. If you are the owner of the content and do not want us to publish your materials on our website, please contact us by email – [email protected]. The content will be deleted within 24 hours.